Sunday, December 22, 2024

Top 5 This Week

Related Posts

Dubai Presents Robot To Declare Iftar Time During Ramadan

Technology knows no bounds and comes in all sizes and types. A self-sufficient robot that was previously installed to monitor stumbling e-scooter and bicycle users can now also be used to call the faithful for prayers and end their fast during Ramadan in UAE, an official from the Roads and Transport Authority (RTA) told media on Thursday.

The five-foot AI-powered robot has speakers and a touchscreen monitor – aside from camera and motion sensors – that can be used to make important announcements. “It’s an added feature that can be activated during the trial period,” noted Hamad Alafeefi, director at RTA’s Enterprise Command and Control Department (EC3).

The robot will go through an initial trial phase of one month, during which it will be sweeping an area of about 600 meters along the busy tourist area of Jumeirah Kite Beach. It will gather data to identify a range of violations, including failure to adhere to safety protocols like wearing helmets and parking in unauthorized areas or having multiple riders on e-scooters.

According to RTA, “the robot is designed to operate efficiently under various weather conditions.” It operates seven days a week – from 3pm to 11pm on weekdays and 5pm to 1am on weekends. It has a 4K camera with night vision.

RTA signed an agreement with Chinese robotics and technical systems provider Terminus to run the project.

Ehsan Hameed, sales director of Terminus Group in the UAE, said the RTA roving robot has similarities to those deployed during Expo 2020. Terminus supplied about 150 robots that interacted with Expo visitors and the RTA roving robot also has interactive functionalities, Hameed noted.

Robot size and dimensions:

Dubai Metro e-Scooter Ban Affects Commuters

Sized with dimensions 1,000mm X 800mm X 1,500mm (LxWxH) – it as an innovation that can hardly be missed. But it works inconspicuously as it either comes to a complete stop or dodges any object or individual within 1.5 meters in front of it. The trial period will run throughout Ramadan, Eid al Fitr and post Ramadan to gather enough information and data before authorities deploy more robots in Dubai in the second phase of the project.

Popular Articles